04.12.2017

Equipment for Platov aerodrome

  • Equipment for Platov aerodrome
  • Equipment for Platov aerodrome
  • Equipment for Platov aerodrome
  • Equipment for Platov aerodrome
  • Equipment for Platov aerodrome

The project for supply of Platov aerodrome of South ATC centre (Rostov-on-Don) is successfully completed. The construction works and fitting out of the site were carried out in the framework of Federal Task Program "The development of Transportation system of Russia (2010-2020 years)” and 2018 FIFA World Cup Preparation and Conduction Program.


In the course of new Tower equipping project NITA, LLC took on the role of provider of VCSS in configuration for 37 workstations and 96 interface modules and recording system suitable for recording 127 voice channels.


In order to arrange auxiliary control centre the complex based on modules of SEGMENT series as part of Tower with 180 degrees visibility and technical control and monitoring module is erected at the territory of aerodrome.


The auxiliary control centre for Platov aerodrome has been developed and fully equipped by NITA, LLC.3 workstations of MEGAPHONE VCSS located at consoles of PULT-A series have been included into control centre modules and radio stations for command and airport internal communication have been installed.


In addition to the basic supply of 8 sets of MEGAPHONE VCSS workstation equipment in simulator version the Tower simulator is equipped.VCSS in simulator version enabled imitation of pilot-controller communication via data link (CPDLC) and speakerphone communication between ATC staff in the course of professional training.


It should be noted that all the works have been fulfilled at a high quality standards and within the shortest time possible in spite of some difficulties due to uncompleted construction works on site.Due to the high level of excellence of the company staff the project schedule has been met without prevarication or delays.