Order and delivery

The equipment may be ordered by preliminary application containing initial data required to determine product configuration and adaptable parameters.

The products are supplied on a turn-key basis including complete cycle from design and production to commissioning.

Time of the equipment manufacture depends on the design complexity and batch size. Average time of delivery is from 3 to 6 months for individual products, and from 6 to 12 months for packaged and automation systems.

The order of the equipment transportation is determined on mutual agreement between the company and customer.

The following works are performed on site:

·    installation,
·    balancing and commissioning,
·    acceptance testing,
·    operator personnel training.

On-site training is provided for the purpose of the product proper use according to operation manuals.